Wimbledon No.1 Court

Wimbledon No.1 Court

Over 12,000 cubic meters of Caltite concrete was used to waterproof parts of the basement structure, spectator terraces, link tunnels and underneath the court itself to provide a permanently, inherently DRY! and corrosion-resistant base. Eliminating the otherwise...
Reef Casino Cairns

Reef Casino Cairns

The fabulous glass domed roof slab itself, relies on Cementaid Everdure Caltite System to keep the casino and hotel DRY! Caltite concrete is permanent, so there will never be a need to ‘replace membranes’ at the end of their service life. Or if the...
Pier 6, Gatwick Airport

Pier 6, Gatwick Airport

The Pier 6 development at Gatwick was built as part of expansion plans to increase the capacity of the airport’s North Terminal. The pier bridge spans a live taxiway, and had to be sufficiently wide and high enough to allow an aircraft the size of a Boeing...
Grove Mill, Coleshill

Grove Mill, Coleshill

Everdure Caltite system waterproof concrete used in the basement slab and retaining walls, swimming pool and landscaped deck forming a roof over the basement.