STANDARD CONSTRUCTION JOINT & SERVICE PENETRATION DETAILS
|
Introduction: The following Standard Details have been used in thousands of different Caltite & 3CC System concrete structures both locally and internationally since 1960, and are proven effective, reliable and maintenance-free over this period. They are simple and easy to handle, and can be applied by the concretor / form-worker / plumber or by Cementaid personnel. We recommend that you ask your Cementaid representative to check the detail drawings before tender stage, and to be present on site to assist the Contractor in achieving optimum results and cost savings obtainable when using Caltite or 3CC System membrane-free construction THE FOLLOWING CONSTRUCTION JOINT & SERVICE PENETRATION DETAILS FORM PART OF THE EVERDURE CALTITE & 3CC SYSTEMS, and are recommended by Cementaid for use with these concrete waterproofing systems. Specification: “All construction joints in, or penetrations through Cementaid Everdure Caltite and / or 3CC System concrete are to be constructed in accordance with the Standard Details supplied by Cementaid (NSW) Pty. Ltd., unless otherwise approved by Cementaid on the working drawings. CALTITE / 3CC SYSTEM CALTITE / 3CC SYSTEM CALTITE / 3CC SYSTEM |