|
All concrete to be construced in accordance iwth the drawings, and strictlyin accordance with current CEMENTAID
3CC System specifications, using not less than 350kg of Ordinary Portland Cement per cubic metre, and having a
W/C Ratio not in excess of 0.42, inconjunctin with structural reinforcement of hard rib deformed bars and top steel
reinforcement grid and other details conforming to current recommendations and requirements of CEMENTAID.
For more detailed specifications, contact Cementaid
|